- Coating Machine Manufacturer
Technical Engineering
Technical meeting before order  Pre-production meeting after order  Drawing / Flow Chart / Control / Program Design  Drawing Checking & Confirmation / Production Schedule  Manufacturing & Quality Inspection  Test Run in Plant / IQ & OQ Documents  Installation / Test Running / After Sales Service  Final close meeting to discuss the imperfection
Quality Assurance  | Since October 1997, Yenchen has passed the ISO 9002 quality assurance inspection that enables all the items or procedures are traceable. This provides a better guarantee for the product quality stability and customer service. |
|