Technical Engineering

HOME > Pharmaceutical Machinery > Technical Engineering

  • Coating Machine Manufacturer

Technical Engineering

Technical meeting before order
                       
Pre-production meeting after order
                       
Drawing / Flow Chart / Control / Program Design
                       
Drawing Checking & Confirmation / Production Schedule
                       
Manufacturing & Quality Inspection
                       
Test Run in Plant / IQ & OQ Documents
                       
Installation / Test Running / After Sales Service
                       
Final close meeting to discuss the imperfection

Quality Assurance

Since October 1997, Yenchen has passed the ISO 9002 quality assurance inspection that enables all the items or procedures are traceable. This provides a better guarantee for the product quality stability and customer service.